Walkability + transit
Murrayville — Walkability, Transit, and Commute
A focused reference on walkability + transit in Murrayville, drawn from the broader Murrayville area page — pulled out as its own page so it’s scannable on its own.
Last reviewed by Bronson Job PREC, REALTOR®. Licence CC BY 4.0. How we verify.
With no traffic, the Highway 1 interchange at 200 Street is 10.6 km and 11.6 minutes from Five Corners, and the planned SkyTrain terminus at 203 Street in Langley City is 3.8 km and 5.2 minutes. Rush hour is longer, so test the drive at the time you would make it.
TransLink Route 560 runs between Langley Centre and Murrayville and stops at the hospital; Route 502 runs between Langley Centre and Surrey Central. The Surrey Langley SkyTrain extension ends at 203 Street in Langley City, and the project’s own site gives late 2029 as the anticipated in-service date. SkyTrain does not serve Murrayville directly.
Also on Murrayville
Bronson Job PREC, REALTOR® at Momentum Realty Inc.. GVR Member #6015742 · FVREB Member #FJOBBR