Skip to main content
Line drawing of Cloverdale
CLOVA

Walkability + transit

Cloverdale — Walkability, Transit, and Commute

A focused reference on walkability + transit in Cloverdale, drawn from the broader Cloverdale area page — pulled out as its own page so it’s scannable on its own.

Last reviewed by Bronson Job PREC, REALTOR®CC BY 4.0How we verify

By car at peak, downtown Vancouver is typically 50–70 minutes via Highway 10 to Highway 1 or via King George Boulevard to the Pattullo Bridge. Off-peak 40–55. Surrey City Centre is 15–20 minutes west; Langley City Centre 10–15 east; the Highway 1 / 176 Street interchange anchors the regional connection.

The future Surrey-Langley SkyTrain extension runs along Fraser Highway south of Cloverdale. The two closest planned stations are Hillcrest-184 Street Station at 184 St & Fraser Hwy and Clayton Station at 190 St & Fraser Hwy — together they most directly affect southeast Cloverdale and the Clayton corridor. Currently targeted to open late 2029 (per the May 2026 BC government update).

Also on Cloverdale

Bronson Job PREC, REALTOR® at Momentum Realty Inc. — Langley + Fraser Valley + Greater Vancouver
Bronson Job PRECREALTOR® · Momentum Realty Inc.GVR Member #6015742 · FVREB Member #FJOBBR