Skip to main content
Skip to article
Line drawing of Cloverdale
CLOVA

Walkability + transit

Cloverdale — Walkability, Transit, and Commute

A focused reference on walkability + transit in Cloverdale, drawn from the broader Cloverdale area page — pulled out as its own page so it’s scannable on its own.

Last reviewed by Bronson Job PREC, REALTOR®. Licence CC BY 4.0. How we verify.

By car at peak, downtown Vancouver is typically 50–70 minutes via Highway 10 to Highway 1 or via King George Boulevard to the Pattullo Bridge. Off-peak 40–55. Surrey City Centre is 15–20 minutes west; Langley City Centre 10–15 east; the Highway 1 / 176 Street interchange anchors the regional connection.

The future Surrey-Langley SkyTrain extension runs along Fraser Highway about three kilometres north-east of the town centre. The two closest planned stations are Hillcrest-184 Street Station at 184 St & Fraser Hwy and Clayton Station at 190 St & Fraser Hwy; together they most directly affect Hillcrest and Clayton. Currently targeted to open late 2029 (per the May 2026 BC government update).

Also on Cloverdale

Bronson Job PREC, REALTOR® at Momentum Realty Inc.. GVR Member #6015742 · FVREB Member #FJOBBR