Skip to main contentSkip to article

Walkability + transit

Fleetwood — Walkability, Transit, and Commute

A focused reference on walkability + transit in Fleetwood, drawn from the broader Fleetwood area page — pulled out as its own page so it’s scannable on its own.

Last reviewed by Bronson Job PREC, REALTOR®CC BY 4.0How we verify

Today: by car at peak, downtown Vancouver runs 60–80 minutes via Highway 1 or Highway 99. Off-peak 45–60. Surrey City Centre is 8–12 minutes west via Fraser Highway; Surrey Central SkyTrain is the closest existing rail access. Highway 1 is the primary regional connection.

Future: the Surrey-Langley SkyTrain extension along Fraser Highway puts TWO stations directly inside Fleetwood — Fleetwood Station at 160 Street and the 166 Street / Bakerview Station. Both are under construction in H1 2026, with TransLink and the Province targeting late-2029 in-service (pushed back from earlier 2028 estimates). Bill 47 TOA framework layers tiered density entitlements (up to 5.0 FAR / 20 storeys within 200 m, stepping down) across each station's 800 m catchment.

Also on Fleetwood

Bronson Job PREC, REALTOR® at Royal LePage Ben Gauer & Associates — Langley + Fraser Valley + Greater Vancouver
Bronson Job PRECREALTOR® · Royal LePage Ben Gauer & AssociatesGVR Member #6015742 · FVREB Member #FJOBBR · Royal LePage Top 35 Under 35 (2021) · Royal LePage Red Diamond Award